Emergencies need somewhere to go
If planned work fills every hour, each burst pipe pushes a booked customer back. If you leave too much free, techs sit idle. Both cost money.
For plumbing businesses on ServiceM8
Burst pipes and blocked drains don't book ahead, so a full diary is a risky diary. SteadyWeeks keeps an emergency buffer on every week and shows how much room is left for planned work over the next eight weeks, counting won jobs and likely quotes.
SteadyWeeks is an 8-week workload forecast for plumbing businesses that use ServiceM8. You choose how many hours a week to keep free for emergency work. The board keeps that buffer on every week and counts booked jobs, won jobs without a date and the share of quotes you usually win against the rest, so you see real room for planned work, not a half-empty diary.
Hours you can plan
2,318
After a 76-hour emergency buffer each week
Hours committed
1,512
65% of the hours you have
Sold, not booked
180 h
26 jobs waiting for a date
Needs attention
Your next 8 weeks, in hours
Example board for a plumbing team of ten, with made-up numbers. The dashed line on each week is where the emergency buffer starts.
A plumbing week is part planned and part unknown. Three things make the diary look emptier, or fuller, than it really is.
If planned work fills every hour, each burst pipe pushes a booked customer back. If you leave too much free, techs sit idle. Both cost money.
Bathroom rough-ins, re-pipes and hot water upgrades often wait weeks for a builder, a deposit or the customer's date. They're sold, but the diary can't see them.
Twenty one-hour drain and tap jobs look like nothing on the diary, but they use the same hours as two big days. Counting in hours shows it.
This example team has 380 hours a week and keeps 76 of them, about 20%, free for emergencies. Planned work only goes into the other 304.
| Week | Planned work (hours) | Emergency work that came in (hours) | Hours available |
|---|---|---|---|
| Wk 1 | 300 | 52 | 380 |
| Wk 2 | 296 | 88 | 380 |
| Wk 3 | 304 | 61 | 380 |
| Wk 4 | 290 | 110 | 380 |
| Wk 5 | 302 | 70 | 380 |
| Wk 6 | 298 | 45 | 380 |
| Wk 7 | 300 | 96 | 380 |
| Wk 8 | 288 | 64 | 380 |
| Wk 9 | 304 | 58 | 380 |
| Wk 10 | 296 | 120 | 380 |
| Wk 11 | 300 | 75 | 380 |
| Wk 12 | 294 | 66 | 380 |
Made-up example numbers. Hover or tap a week for the detail.
On the setup call we list your common job types and how long each really takes your crew, including travel. That turns a list of Work Orders into hours you can plan with.
Short reactive jobs are usually left out of the table and covered by the buffer instead, because they rarely book ahead.
| Job type | Hours | Crew |
|---|---|---|
| Hot water system replacement | 3.5 | 1 |
| Bathroom rough-in | 14 | 2 |
| Bathroom fit-off | 8 | 1 |
| Re-pipe, single-storey house | 24 | 2 |
| Blocked drain with jetter | 2 | 1 |
| Backflow test and report | 1 | 1 |
Made-up example times to show the format. Yours come from your own job history.
Your next 8 weeks: the buffer is safe
Morning,
Weeks 1 and 2 are nearly full, with 76 hours a week still kept for emergencies.
Weeks 5 to 8 have room. Good time to book in the hot water upgrades you quoted.
180 hours of won work has no date. 26 jobs, mostly bathroom rough-ins.
Before the first call-out, you know which weeks are full with the buffer kept, where planned work fits and which won jobs still need a date.
The same everything-included setup for every business, tuned to plumbing work on the setup call.
Something else on your mind? Email taimoor@steadyweeks.com.
You choose how many hours a week to keep free for emergencies, for example 20% of your team's hours. The board shows that buffer on every week and only counts the rest as room for planned work, so you stop filling the week before the burst pipes arrive.
Look at how many hours of reactive work you did each week over the last two or three months. Many owners start with the average and adjust from there. Our guide on emergency capacity walks through it with a worked example.
Anything that's in your ServiceM8 diary is counted, including maintenance visits. During setup we check how your recurring work is entered, so it isn't missed or counted twice.
Yes. Short jobs are where a labour table helps most, because twenty one-hour jobs and two ten-hour jobs look very different in the diary but use the same hours.
You connect ServiceM8, and within 48 hours we send your next eight weeks of booked hours against your team's hours, plus a count of jobs still waiting for a date. It's free, there's no obligation, and you can disconnect straight after.
Connect ServiceM8 and within 48 hours you'll see your booked hours against the hours your team actually has, plus how many jobs are still waiting for a date.
Free, no obligation. Read-only access you can switch off.