SteadyWeeks Free 8-week checkFree check

For plumbing businesses on ServiceM8

Keep room for emergencies. Fill the rest.

Burst pipes and blocked drains don't book ahead, so a full diary is a risky diary. SteadyWeeks keeps an emergency buffer on every week and shows how much room is left for planned work over the next eight weeks, counting won jobs and likely quotes.

In short

SteadyWeeks is an 8-week workload forecast for plumbing businesses that use ServiceM8. You choose how many hours a week to keep free for emergency work. The board keeps that buffer on every week and counts booked jobs, won jobs without a date and the share of quotes you usually win against the rest, so you see real room for planned work, not a half-empty diary.

Workload boardExample plumbing team of 10, with 76 hours a week kept for emergencies

Hours you can plan

2,318

After a 76-hour emergency buffer each week

Hours committed

1,512

65% of the hours you have

Sold, not booked

180 h

26 jobs waiting for a date

Needs attention

  • Weeks 1 and 2 are nearly full, with the buffer kept
  • Weeks 5 to 8 have room for planned work

Your next 8 weeks, in hours

  1. Wk 1 TightWeek 1: 300 of 304 hours committed.
  2. Wk 2 TightWeek 2: 292 of 304 hours committed.
  3. Wk 3 SteadyWeek 3: 250 of 304 hours committed.
  4. Wk 4 SteadyWeek 4, one plumber on leave: 210 of 266 hours committed.
  5. Wk 5 RoomWeek 5: 170 of 304 hours committed.
  6. Wk 6 RoomWeek 6, public holiday: 130 of 228 hours committed.
  7. Wk 7 RoomWeek 7: 100 of 304 hours committed.
  8. Wk 8 RoomWeek 8: 60 of 304 hours committed.
BookedWon, not bookedLikely quotesAll hoursEmergency buffer starts
Example plumbing board with made-up numbers. Each week keeps 76 hours free for emergency work, and only the rest counts as room for planned jobs.

Example board for a plumbing team of ten, with made-up numbers. The dashed line on each week is where the emergency buffer starts.

Why plumbing diaries are hard to read

A plumbing week is part planned and part unknown. Three things make the diary look emptier, or fuller, than it really is.

Emergencies need somewhere to go

If planned work fills every hour, each burst pipe pushes a booked customer back. If you leave too much free, techs sit idle. Both cost money.

Big jobs hide in Work Orders

Bathroom rough-ins, re-pipes and hot water upgrades often wait weeks for a builder, a deposit or the customer's date. They're sold, but the diary can't see them.

Short jobs add up quietly

Twenty one-hour drain and tap jobs look like nothing on the diary, but they use the same hours as two big days. Counting in hours shows it.

How an emergency buffer works

This example team has 380 hours a week and keeps 76 of them, about 20%, free for emergencies. Planned work only goes into the other 304.

  • Most weeks the emergencies fit inside the buffer, so nobody's booked job gets pushed.
  • The big weeks still happen. Because you can see them, you decide on overtime or moving a flexible job early, not at 7 am.
  • You set the size from your own history and change it by season. The board does the rest.

How to size your emergency buffer

Example: a plumbing team of 10 over 12 weeks, keeping 76 hours free each week
0110220330440Wk 1Wk 2Wk 3Wk 4Wk 5Wk 6Wk 7Wk 8Wk 9Wk 10Wk 11Wk 12
Example: a plumbing team of 10 over 12 weeks, keeping 76 hours free each week
WeekPlanned work (hours)Emergency work that came in (hours)Hours available
Wk 130052380
Wk 229688380
Wk 330461380
Wk 4290110380
Wk 530270380
Wk 629845380
Wk 730096380
Wk 828864380
Wk 930458380
Wk 10296120380
Wk 1130075380
Wk 1229466380

Made-up example numbers. Hover or tap a week for the detail.

Your labour table, in your hours

On the setup call we list your common job types and how long each really takes your crew, including travel. That turns a list of Work Orders into hours you can plan with.

Short reactive jobs are usually left out of the table and covered by the buffer instead, because they rarely book ahead.

Example labour table for a plumbing business
Job typeHoursCrew
Hot water system replacement3.51
Bathroom rough-in142
Bathroom fit-off81
Re-pipe, single-storey house242
Blocked drain with jetter21
Backflow test and report11

Made-up example times to show the format. Yours come from your own job history.

Your next 8 weeks: the buffer is safe

SteadyWeeksMonday 6:30 am

Morning,

Weeks 1 and 2 are nearly full, with 76 hours a week still kept for emergencies.

Weeks 5 to 8 have room. Good time to book in the hot water upgrades you quoted.

180 hours of won work has no date. 26 jobs, mostly bathroom rough-ins.

A Monday email written for a plumbing business

Before the first call-out, you know which weeks are full with the buffer kept, where planned work fits and which won jobs still need a date.

  • Weeks that are full once the emergency buffer is kept
  • Room for the hot water and bathroom work you've quoted
  • Won jobs with no date, oldest first

See my own next 8 weeks

What's included

The same everything-included setup for every business, tuned to plumbing work on the setup call.

What you getWhat it replaces
8-week workload boardEvery week in hours on any phone, updating through the day.
The Sunday-night scroll through the diary
Monday emailWhat's over, what has room and what still needs a date.
Remembering to check
Labour table built with youYour real hours for each job type, set on the setup call.
Guessing how long the stack of jobs will take
Job captureRecord, paste or forward a job and it lands in ServiceM8.
Jobs written on the back of a docket
Monthly one-page reportJobs captured and hours booked against hours available.
A spreadsheet nobody updates
ServiceM8 tune-up BonusWe switch on the review requests and quote follow-ups ServiceM8 already includes.
Features you pay for and don't use
Diary rules for your crew BonusA one-page booking guide so the diary stays accurate.
Chasing techs to update jobs

Pricing, the guarantee and founding places

Questions from plumbing owners

Something else on your mind? Email taimoor@steadyweeks.com.

All questions

How does SteadyWeeks handle emergency work?

You choose how many hours a week to keep free for emergencies, for example 20% of your team's hours. The board shows that buffer on every week and only counts the rest as room for planned work, so you stop filling the week before the burst pipes arrive.

How big should an emergency buffer be?

Look at how many hours of reactive work you did each week over the last two or three months. Many owners start with the average and adjust from there. Our guide on emergency capacity walks through it with a worked example.

Does it count maintenance and recurring jobs?

Anything that's in your ServiceM8 diary is counted, including maintenance visits. During setup we check how your recurring work is entered, so it isn't missed or counted twice.

Our jobs are short, mostly under two hours. Does it still work?

Yes. Short jobs are where a labour table helps most, because twenty one-hour jobs and two ten-hour jobs look very different in the diary but use the same hours.

What's in the free 8-week check?

You connect ServiceM8, and within 48 hours we send your next eight weeks of booked hours against your team's hours, plus a count of jobs still waiting for a date. It's free, there's no obligation, and you can disconnect straight after.

See your next eight weeks, free

Connect ServiceM8 and within 48 hours you'll see your booked hours against the hours your team actually has, plus how many jobs are still waiting for a date.

Get my free 8-week check

Free, no obligation. Read-only access you can switch off.